logo
Home ProductsArchitectural Model Maker

Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model

Good quality Architectural Scale Model People for sales
Good quality Architectural Scale Model People for sales
Trustworthy partner

—— Juicy

I'm Online Chat Now

Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model

China Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model supplier
Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model supplier Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model supplier

Large Image :  Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model

Product Details:

Certification: CE ROHS
Model Number: miniature MODELS

Payment & Shipping Terms:

Minimum Order Quantity: 1 PIECE
Price: 100USD TO 10000USD
Packaging Details: WOOD PACK
Delivery Time: 25DAYS
Payment Terms: EXW FOB
Supply Ability: 2 SET PER WEEK
Detailed Product Description
Highlight:

architectural model making

,

architectural model makers

 

Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model

 

 

Architectural Scale Model Making

Of all things that you can put in a sales suite, a scale model is still the first thing to catch a buyer/visitor's eye. Archiform 3D, a leader in marketing materials for real estate property development, has branched into model making to compliment it's extensive digital media offerings. Now our clients can issue just one set of briefing documents to get their physical models, 3D renderings and animations together.

Scale Models

Recreating the finished project in miniature scale, physical models are mainly seen as representations for new building and boat designs. Architectural scale models is our main focus with our already extensive clientele base and immediate need.

Model Making

Building models, is an extremely labor intensive process, even more so than our 3D models. Each piece is made partially by hand and machine, with mistakes often meaning waste and re-milling. This all means that the cost of a physical scale model is more expensive than a 3D virtual one.

Samples of our scale models

Our growing portfolio of work will go online as quickly as we can get it there and will include multiple pictures showing various facets and details.

Architectural models

Scale models for architecture have been in existence for years, and while the core techniques remain the same, subtle differences in construction materials, lighting, resins and tools have improved the finished results while reducing lead times.

Improvements have meant better and more realistic trees, water and props such as cars and people.

Architectural Model Makers

Architectural models have their own special techniques and a mandatory expectation of high-quality. Residing mainly in sales suites, these models are scrutinized and admired by most that walk through the doors. In the eyes of the buyer the quality of the product is a direct reflection of the model.

 

An expert in architectural models/ Miniature Buildings/ scale modelings

Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model

 

SectionA: How to order

 

For Architecture Model,we would appreciate necessary information for the project such as :

•Site plan

•Masterplan

•bundaries of the site plan that should be included on the scale model.

•renderings

•Building floorplan

•Facades(master plan,elevation,section)

•Visualization ,video if AP.

 

•Scale that you want the model, or overall size you envisioning

• Detail level:  All white massing model, or full color and detail? Lighting,arcylic cover and wooden case included?                                                                       

·  Exterior Only model, or Interior included? 
• Use of the scale model

>> Official  proposal(Quote and solution detailed) will be sent within 24 hours.

 

SectionB: model making process and materials

All buildings adopt CAD drawing, TYPE3 software drawing carving. Construction process using the latest computer engraving machine work, seamless splicing.

 

-process

 

(1) the use of advanced computer laser cutting engraving machine cutting processing and fine processing technology;

 

(2) milling machine, lathe, planer processing technology; Wire cutting processing technology;

 

(3) to use putty or solubility seamless bonding process of oxidation;

 

(4) vacuum blister processing technology.

 

 

 

 

 

-Materials

Model details

Material

Features advantages

Metope, walls, doors and Windows

ABS Model for plate; Brand organic glass

 

rail

metal copper; ABS; Gram force

 

floor decoration

Medium density board; Imitation stone ABS special plate model

 

Surface,water

Water lines organic glass

 

water ripple

AB glue water of LM

Scenario clear

Entourage of, people, car

LM

Modelling lifelike

Entourage of greening grass meal

FALLER of Germany

Simple sense nice, not easy to change color

Entourage of green, grass

FALLER of Germany

Simple sense nice, not easy to change color

Entourage of, landscaping, flowers and trees

LM

 

adhesive

A-A of Japan

Strong&strict

adhesive

UHU of Germany

Strong&strict

Model building interior lighting

LEDs of LM

Environmental protection, energy saving, security, fire prevention

Model construction exterior paint (matte, light and matte)

Exports of paint

Do not fade, good gloss, color clear

Ambient lighting

LEDs

Environmental protection, energy saving, security, fire prevention

chassis base

brand plate

Strong, durable

Section C: Sample Project Gallery

 

 

 

 Section D: Workshop  and Certificate

Portable 3DArchitectural Model Maker , Miniature Villa Project Planning Model

Contact Details
Guangzhou Limei Model Design Co., Ltd.

Contact Person: Ms. Iris Lee

Send your inquiry directly to us (0 / 3000)